El Paso Electric
Search
 
Your Electric Company
Home
|
Contact EPE
|
Customer Service
|
Bill Pay
|
Careers
|
Community
|
Education
|
About EPE
|
Investor Relations
|
Corporate Governance
|
Transmission
Transmission
Archives
Documents
Interconnection Requests
Standards of Conduct
OATI OASIS
Transmission Studies
Transmission Tariff
EPE URL Master List
Request for Clarification on EPE 2009 Diversity RFP
Open Access Transmission Tariff
Any existing long term customer that wishes to exercise its reservation priority must make an application for its new service term following the usual
pro forma
tariff procedures and notify the transmission provider, no less than one year prior to the date an existing long term contract ends and the new service term commences, that the long-term transmission customer wishes to exercise its reservation priority (right of first refusal) under Section 2.2 of the
pro forma
tariff.
OATT (Effective 09/11/09)
Regional Experimental Tariff (Effective 02/11/09)
Annex A to Regional Experimental Tariff (Effective 07/01/09)
WECC Unscheduled Flow Mitigation Plan
http://www.wecc.biz/documents/library/UFAS/UFAS_mitigation_plan_rev_2001-clean_8-8-03.pdf
WECC Unscheduled Flow Reduction Procedure
http://www.wecc.biz/documents/library/UFAS/WECC_UnscheduledFlow%20ReductProc_7-14-03.pdf
WECC Standard IRO-STD-006-0 (Qualified Path Unscheduled Flow Relief)
http://www.wecc.biz/documents/library/Standards/IRO-STD-006-0.pdf
Small Generator Interconnection Procedures
Small Generator Interconnection Agreement
Attachment A - Firm
Attachment B- Non-Firm
Transmission Contact Information
Order Granting Waiver
Copyright © El Paso Electric Company
Legal Notice
      
Privacy Statement
Design by: Polar Bear Media