Transmission Studies

Interconnection/Transmission Study Reports

Hide details for 20082008
Amrad-Eddy 345 - 500 MW Wind SIS (Changes to SIS)
Amrad-Eddy 345 - 500 MW Wind SIS Addendum
Amrad-Eddy 345 - 500 MW Wind SIS
Interaction Study btw Wind Farm and Eddy HVDC - GE
Internal Transmission Segment TTC Study
Transmission Upgrade Analysis 12-2006 RFP
Transmission Upgrade Analysis 10-18-2006 RFP
Transmission Study with New#5 & New Military Loads
New Mexico System Transmission Line Study
EPE Native System Reactive Requirement Study
Airport Substation Second Transmission Line Study
LEF/Lordsburg to EPE Resident Load 200MW/270 MW TSR
Hide details for 20072007
Coyote 115 - 150 MW Generator Wind
Amrad-Eddy 345 - 500 MW Generator Wind (Phased)
Sierra Blanca-Farmer 69 - 30 MW Generator (Wind)
Hide details for 20062006
Amrad-Eddy 345 - 500 MW Generator (Wind)
Luna to EPE Resident Load - 100 MW TSR
Luna 345 - 300 MW Solar Generation
Luna to EPE Resident Load 185 MW TSR
Hide details for 20052005
Central El Paso 115 kV Generator - 250 MW
Eddy County-50 MW-200 MW Paralleling Existing HVDC Terminal
Hide details for 20042004
Newman 115 - 290 MW Generator
Caliente 345 & 115 - 285 MW Generator
Newman-Luna 345 kV - 160 MW Generator