El Paso Electric
Search
 
Your Electric Company
Home
|
Contact EPE
|
Customer Service
|
Bill Pay
|
Careers
|
Community
|
Education
|
About EPE
|
Investor Relations
|
Corporate Governance
|
Transmission
Transmission
Archives
Documents
Interconnection Requests
Standards of Conduct
OATI OASIS
Transmission Studies
Transmission Tariff
EPE URL Master List
Request for Clarification on EPE 2009 Diversity RFP
Transmission Studies
Interconnection/Transmission Study Reports
2010
Generator Interconnection Cluster Study - 345 KV Feasibility
Diablo-SantaTeresa 115 kV line - 99.8 MW Solar (SIS Cluster)
Springerville-Luna 345 kV line-99 MW Wind (SIS)
2009
WestMesa-Arroyo 345 kV line-495 MW Wind (SIS)
System Impact Study: 60 MW Conditional Firm Luna 345 to WM 345
ReStudy WestMesa-Arroyo 345 kV line-990 MW Wind
TSR SIS 60 MW Coyote115 to Springerville345
2008
WestMesa-Arroyo 345 kV line-990 MW Wind
Springerville-Luna 345 kV - 99 MW Wind
Luna 345 - 120 MW Solar Generation
Amrad-Eddy 345 - 500 MW Wind SIS (Changes to SIS)
Amrad-Eddy 345 - 500 MW Wind SIS Addendum
Amrad-Eddy 345 - 500 MW Wind SIS
Interaction Study btw Wind Farm and Eddy HVDC - GE
EPE Transmission Segment TTC Study
Transmission Upgrade Analysis 12-2006 RFP
Transmission Upgrade Analysis 10-18-2006 RFP
Transmission Study with New#5 & New Military Loads
New Mexico System Transmission Line Study
EPE Native System Reactive Requirement Study
Airport Substation Second Transmission Line Study
LEF/Lordsburg to EPE Resident Load 200MW/270 MW TSR
2007
Coyote 115 - 150 MW Generator Wind
Amrad-Eddy 345 - 500 MW Generator Wind (Phased)
Sierra Blanca-Farmer 69 - 30 MW Generator (Wind)
2006
Copyright © El Paso Electric Company
Legal Notice
      
Privacy Statement
Design by: Polar Bear Media