Generator Interconnection Queue
Transmission
EPE Transmission Real Time Data
Documents
Generator Interconnection Queue
Generator Interconnection Studies
Transmission Studies
OATI OASIS
Standards of Conduct
System Operations Job Descriptions
Transmission Systems Job Descriptions
Transmission Tariff
EPE URL Master List
Request for Clarification on EPE 2009 Diversity RFP
Queue Position 1:
320 MW Wind Artesia 345 kV (Cluster)
Queue Position 2:
100 MW Wind Amrad-Eddy 345 kV Line (Cluster)
Queue Position 3:
99.8 MW Solar Diablo-Santa Teresa 115 kV Line
Queue Position 4:
87 MW Gas-Fired
Queue Position 5:
WITHDRAWN: 300 MW Wind on West Mesa-Arroyo 345 kV line
Queue Position 6:
50 MW Solar PV
Queue Position 7:
RG87G 20 MW Increase System Impact Study
Queue Position 8:
420 MW Gas-Fired