System Impact Study to increase RG87G gas fired project generating capacity from 87 MW to 107 MW.
SIS Study for WA300W Wind Project
Facilities Study for RG87G Generation Interconnection Project
Facilities Study for 345 kV Cluster Study
Re-Study of RG87G SIS due to withdrawal of project senior to the RG87G project.
System Impact Study for 87 MW gas turbine
Feasibility Study for 99.8 MW Solar PV project at Luna 345 kV Substation.
345 kV Cluster SIS completed July 2011.
345 kV Cluster SIS Re-Study completed May 2011.
345 kV Cluster System Impact Study completed November 2010.
345 kV Cluster Feasibility Study completed May 2010.
Gen Interconn Study - 500 MW at Newman 115
Gen Interconn Study - 500 MW Wind near Amrad
Gen Interconn Study - 1200 MW at Luna 345