News

TxDOT Directs Date Change for I-10 Closure for Electrical Work

March 17, 2016

TxDOT has directed a scheduling change for the second eastbound and westbound closure on I-10 and Paisano, now to take place on Saturday, March 19, 2016. This closure will be in effect from 3 a.m. to 3 p.m., between Sunland Park Drive and Executive Center Blvd. This is to allow EPE crews to safely complete the relocation, addition and rewiring of transmission structures between Sunland Park Drive and Paisano Drive. This construction work is necessary to allow TxDOT to move forward with the GO 10 Project.

Closures include:

  • Eastbound and westbound lanes I-10 from Sunland Park Drive and Executive Center Blvd
  • Paisano Drive at Executive Blvd. and Sunland Park Drive and Paisano Drive
  • Crockett Street between Sunland Park Drive and Paisano Drive 

Detour Information:

  • Eastbound: All traffic must exit Sunland Park Drive; turn left onto Sunland Park; turn right onto Mesa. Commuters can take Mesa to Downtown or turn right on Executive to I-10 eastbound ramp
  • Westbound: All traffic must exit Executive Center; right at Executive Center. Commuters can take Mesa to I-10 or turn left on Sunland Park to I-10 westbound ramp