Posted on September 10, 2021

PARTIAL ROAD CLOSURE: El Paso Electric Contractor To Work Along Horizon Blvd. at Ellsworth Rd.

PARTIAL ROAD CLOSURE: El Paso Electric Contractor To Work Along

Horizon Blvd. at Ellsworth Rd.

HORIZON CITY, Texas – As part of an ongoing initiative to meet the growing energy demands in far East El Paso and Horizon City, Texas, El Paso Electric (EPE) will require a partial road closure along Horizon Boulevard at Ellsworth Road so contractor, Elite, can safey cross electric wires near the intersection. The partial road closure will take place this Sunday, September 12 from 6:00 a.m. to 12:00 p.m.

There will be no complete road closures along Horizon Blvd. Thru-traffic will still be able to utilize Horizon Blvd; traffic will be reduced to one-lane at Ellsworth Rd. Horizon Police will be onsite to assist with the partial road closure and traffic control.

Commuters are asked to respect construction barricades, signage, and to be mindful of reduced speed limits in the area.

EPE Chat