2012-13 Winter Reliability Must Run Study, Revision 2
NERC Standards TPL-001 and TPL-002: Summary of EPE's 2013 Bulk Electric System Transmission Assessment for years 2013-2022
Based on Updated Methodology (EPIC2) – Revision
Version 1.7.03 (revised April 2013)
10 Year Plan - 2013 to 2022
Open Planning Meeting minutes - September 25, 2012
NERC Standard TLP-004-2a memo on System Performance for Category D in years 2013 & 2017
NERC Standard TPL-003-1 memo on System Performance for Category C in years 2013, 2015, 2017 & 2022
Presentation from Open Planning Meeting on October 10, 2011
July 2010 Import EPE Limit Study memo W SPS to EPE
July 2010 Import EPE Limit Study memo W EPE to SPS
Guidance for Caliente-Newman IOS in the event that the Eddy County tie is unavailable
Updated Caliente-Newman IOS Study
Caliente-Newman IOS (February 2011)
Total Transfer Capabilities for Internal Transmission Paths under NERC Standard MOD-029-1
2005 New Mexico Transmission Operating Procedures