PUCT

Dkt No. 39159 - 5/3/11 Final Order
Link = /document/172

Dkt No. 38802 - 12/16/10 Final Order
Link = /document/173

Dkt No. 38717 - 9/23/10 Application for CCN for Rio Grande Unit 9
Link = /document/138

For all filings for this Application please go to PUCT website.

Dkt No. 37690 - 7/30/10 Final Order
Link = /document/142

NMPRC

Notice to New Mexico EPE Customers
Link = /document/336

NMPRC Case No. 09-00171-UT - 5/29/09 Executive Summary of Requested Rate Changes and Continuation of Fuel and Purchased Power Adjustment Clause
Link = /document/7

                                                                                                                                          

FERC

2017/Q3 FERC Form 3-Q
Link = /document/378

2017/ Q2 FERC Form 3-Q
Link = /document/377

2016 FERC Form1
Link = /document/367

2017 /Q1 FERC Form 3-Q
Link = /document/368

2016/Q3 FERC Form 3-Q
Link = /document/362

2016/Q1 FERC Form 3-Q
Link = /document/360

2016/Q2 FERC Form 3-Q
Link = /document/361

2015 FERC Form 1
Link = /document/354

2015/Q3 FERC Form 3-Q
Link = /document/352

2015/Q2 FERC Form 3-Q
Link = /document/348

2015/Q1 FERC Form 3-Q
Link = /document/344

2014 FERC Form 1
Link = /document/313

2014/Q3 FERC Form 3-Q
Link = /document/304

2014/Q2 FERC Form 3-Q
Link = /document/292

2014/Q1 FERC Form 3-Q
Link = /document/286

2013 FERC Form 1
Link = /document/281

2013/Q3 FERC Form 3-Q
Link = /document/278

2012 FERC Form 1
Link = /document/257

2011 FERC Form 1
Link = /document/224

2010 FERC Form 1
Link = /document/170

2009 FERC Form 1
Link = /document/158

2008 FERC Form 1
Link = /document/159

Transmission Documents

Notice of EPE Transmission Planning Meeting September 2018
Link = /document/387

Notice of El Paso Electric Company Transmission Open Planning Meeting

2018 LSCG Table with MPS 3 & 4
Link = /document/276

2018 Load Serving Capability Generation (LSCG) Results with MPS 3 & 4: Revised March 2018 

EPIC IOS Limits 09-2017
Link = /document/369

El Paso Import Capability (EPIC) Initially Out of Service (IOS) Transmission Limit Table 09-2017

Path 47 IOS Limits - 2017
Link = /document/283

Initially Out of Service (IOS) Transmission Element and associated Path 47 Limit Table updated 08-2017

NAESB Home Page
Link = /document/359

NAESB Home Page

Reference Tool for Prospective Solar PV Interconnection Customers
Link = /document/332

Reference document for prospective Solar PV Interconnection Customers to provide required technical data in Attachment A of Appendix 1 (Interconnection Request for a Large Generating Facilitiy).   

Study of impacts of Luna-Diablo line outage scheduled for February 21, 2015
Link = /document/309

EPE is discussing with Tri-State Generation and Transmission Association, Inc. the potential for steps to mitigate the effects of the outage. Click for details.

Updated: February 16, 2015

NERC Standards TPL-001 & TPL-002: Summary of EPE's 2015-2024 Expansion Plan
Link = /document/285

A Review on System Performance Under Normal and Single Contingency Conditions of the El Paso Electric (EPE) Company Transmission System to Demonstrate Perormance Compliance As Required by Reliability Standards TPL-001 & TPL-002 

Posting under Section 9.6.1 of LGIA
Link = /document/280

Posting regarding Section 9.6.1 of EPE's Large Generator Interconnection Agreement (LGIA)

EPE Service Territory Transmission Map 2014
Link = /document/54

Map of EPE Service Territory (Updated 03-10-2014)

EPE Facility Rating Methodology
Link = /document/277

EPE Facility Rating Methodology

2014 TPL-003-1 memo
Link = /document/227

NERC Standard TPL-003-1 memo on System Performance for Category C in years 2014, 2016, 2018 & 2023

Updated October 7, 2014

New Mexico Transmission Operating Procedures
Link = /document/256

2005 New Mexico Transmission Operating Procedures

EPE Load Area Imports Limit Calculation (EPIC)
Link = /document/23

Based on Updated Methodology (EPIC2) – Transformer Uprate Equation Report

Capacity Spin and Non-Spin Procedure
Link = /document/24

Order Granting Waiver
Link = /document/30

Generator Interconnection Studies

EPE Fall 2017 Cluster Restudy #4
Link = /document/396

EC300W ERIS Final Report 10-01-2018
Link = /document/392

ERIS Final Report for EC500W project (was reduced by Interconnection Customer to 300 MW for ERIS study)

H252W SIS Restudy 08-2018
Link = /document/391

H252W ERIS Generator Interconnection  Restudy report.

N200S Solar PV SIS Re-Study Report 08-2018
Link = /document/390

EPE N200S SIS Re-Study Report 8-29-2018

LA450S ERIS Restudy Final Report 11-30-2017
Link = /document/380

Re-Study of LA450S for Energy Resource Interconnection Service (ERIS)

LA450S SIS Final Report 6-29-2017
Link = /document/375

Final NRIS SIS Report for LA450S project.

CA200S System Impact Study 1-31-2017
Link = /document/364

System Impact Study (SIS) was finalized on 1-31-2017 and sent to the Interconnection Customer (IC). 

DS90S PV Project
Link = /document/353

Final Report of the DS90S Solar PV Facilities Study. 

115 kV Cluster SIS
Link = /document/306

System Impact Study Final Report of 115 kV Cluster Study

10 MW Solar PV Facilities Study 08-2013
Link = /document/264

Facilities Study for 10 MW Solar PV generation project

10 MW Solar PV Generation Feasibility Study 05-2013
Link = /document/259

Feasibility Study for 10 MW Solar PV generation project

East El Paso Cluster Facilities Study
Link = /document/247

East El Paso Cluster Facilities Study Report - January 2013

HL20S Facilities Study Report
Link = /document/248

HL20S Facilities Study Report

Re-Study of East El Paso Cluster SIS
Link = /document/236

Re-Study of East El Paso Cluster SIS 08-2012

HL20S PV Feasibility Study
Link = /document/237

HL20S PV Feasibility Study 07-2012

Addendum to 345 kV Cluster Study
Link = /document/239

Addendum to 345 kV Cluster Study 08-2012

Addendum #2 to East El Paso Cluster SIS
Link = /document/235

Addendum #2 to East El Paso cluster SIS 08-2012

Addendum to RG87G 20 MW Increase SIS
Link = /document/240

Addendum to RG87G 20 MW Increase SIS 08-2012

MS50S Facilities Study Report
Link = /document/246

Facilities Study report for MS50S Solar PV interconnection project

Addendum to East El Paso Cluster SIS
Link = /document/234

Addendum to East El Paso Cluster SIS 07-2012

East El Paso Cluster System Impact Study Final Report
Link = /document/233

East El Paso System Impact Study Final Report 06-2012

RG87G 20 MW Increase SIS
Link = /document/221

System Impact Study to increase RG87G gas fired project generating capacity from 87 MW to 107 MW 03-2012

MS50S ERIS Final Report
Link = /document/211

WA300W SIS Re-Study #2 Final Report
Link = /document/210

SIS Study for WA300W Wind Project

ART320W ERIS Final Report
Link = /document/206

RG87G Facilities Study
Link = /document/202

Facilities Study for RG87G Generation Interconnection Project 

345 kV Cluster Facilities Study
Link = /document/203

Facilities Study for 345 kV Cluster Study

RG87G SIS Re-Study
Link = /document/192

Re-Study of RG87G SIS due to withdrawal of project senior to the RG87G project.

RG87G SIS
Link = /document/183

System Impact Study for 87 MW gas turbine

LU99.8S Feasibility Study
Link = /document/181

Feasibility Study for 99.8 MW Solar PV project at Luna 345 kV Substation.

345 kV Cluster SIS Re-Study #2
Link = /document/177

345 kV Cluster SIS completed July 2011.

345 kV Cluster SIS Re-Study #1
Link = /document/176

345 kV Cluster SIS Re-Study completed May 2011.

Generator Interconnection Cluster Study-345 kV SIS
Link = /document/175

345 kV Cluster System Impact Study completed November 2010.

Additional Eddy DC Tie Final Report
Link = /document/63

Gen Interconn Study - 250 MW at WR
Link = /document/79

Gen Interconn Study - 500 MW at Newman 115
Link = /document/86

Gen Interconn Study - 500 MW at Newman 115

Gen Interconn Study - 500 MW Wind near Amrad
Link = /document/88

Gen Interconn Study - 500 MW Wind near Amrad

Gen Interconn Study - 1200 MW at Luna 345
Link = /document/92

Gen Interconn Study - 1200 MW at Luna 345

Generator Interconnection Cluster Study - 345 kV Feasibility
Link = /document/25

345 kV Cluster Feasibility Study completed May 2010.