Notice of EPE Transmission Planning Meeting 09-13-2019

 NAESB Home Page

 2018 LSCG Table with MPS 3 & 4
2018 Load Serving Capability Generation Results with Montana Power Plants 3 & 4 Revised: March 2018

 Notice of EPE Transmission Planning Meeting September 2018
Notice of El Paso Electric Company Transmission Open Planning Meeting

 Notice of EPE Transmission Planning Meeting March 2018
Notice of El Paso Electric Company Transmission Open Planning Meeting

 EPE Planning Meeting Agenda
EPE Transmission Planning Meeting Agenda September 12, 2017

 Path 47 IOS Limits August 2017
Initially Out of Service Transmission Element and associated Path 47 Limit Table Updated: August 2017

 EPIC IOS Limits September 2017
El Paso Import Capability Initially Out of Service Transmission Limit Table September 2017

 EPE Facility Rating Methodology

 Methodology for Determining SOL for Planning Horizon

 Reference Tool for Prospective Solar PV Interconnection Customers
Reference document for prospective Solar Photovoltaic Interconnection Customers to provide required technical data in Attachment A of Appendix 1 (Interconnection Request for a Large Generating Facility).

 EPE Reports on the Results of its Communications with Tri-State regarding the Scheduled Luna-Diablo Outage.

 Study of impacts of Luna-Diablo line outage scheduled for February 21, 2015
EPE is discussing with Tri-State Generation and Transmission Association, Inc. the potential for steps to mitigate the effects of the outage. Click for details. Updated: February 16, 2015

 2014 TPL-003-1 memo
NERC Standard TPL-003-1 memo on System Performance for Category C in years 2014, 2016, 2018 & 2023 Updated: October 7, 2014

 NERC TPL-004 Summary of 2015-2024 Expansion Plan Extreme Events
A Review on System Performance Following Extreme Bulk Electric System Events of the El Paso Electric Company Transmission System to Demonstrate Compliance as Required By TPL-004 Updated: October 7, 2014

 NERC Standards TPL-001 & TPL-002: Summary of EPE's 2015-2024 Expansion Plan
A Review on System Performance Under Normal and Single Contingency Conditions of the El Paso Electric Company Transmission System to Demonstrate Performance Compliance as Required by Reliability Standards TPL-001 & TPL-002

 Posting under Section 9.6.1 of LGIA
Posting regarding Section 9.6.1 of EPE's Large Generator Interconnection Agreement

 EPE Load Area Imports Limit Calculation (EPIC)
Based on Updated Methodology (EPIC2) – Transformer Uprate Equation Report

 Order Granting Waiver

 New Mexico Transmission Operating Procedures
2005 New Mexico Transmission Operating Procedures

 Capacity Spin and Non-Spin Procedure

 Technical Requirements for Connecting Transmission Facilities to the EPE Transmission System

 Principles, Practices and Methods for the Determination of Available Transfer Capacity for EPE

 Available Transfer Capability Implementation Document (ATCID)