El Paso Electric's History - From Mule Car to Nuclear Power

Our History

From Mule Car to Nuclear Power:  El Paso Electric’s history parallels the history of El Paso’s transportation and the development of the community.

1901

By glancing at the methods of transportation used from pioneer days to the present, you can get an idea of the city’s evolution from an adobe village into a modern metropolis.

For more than a half century, El Paso was a sleepy frontier settlement with a population that never exceeded a few hundred. Its first settler had crossed from Juarez (Paso del Norte) in 1827. Business was concentrated on the Mexican side of the Rio Grande.

In that early period, wagon trains came through El Paso over the perilous Santa Fe Trail. Stage coaches made El Paso a stop on their transcontinental routes. There were livery stables and ox carts. And there was a ferry service between El Paso and Juarez consisting of a small, flat bottomed boat which could be operated only when there was enough water in the river. The late Capt. J.J. Sullivan of the Fire Department operated the ferry service in the 1880s.

El Paso’s modern era dates from 1881, when the first railroad was built. In one month, from May to June 1881, El Paso’s population increased from 761 to 1,500, and the growth has never stopped. Today, El Paso County is a thriving metropolitan area of more than 600,000.

El Paso Electric’s 100-year history of providing electrical power to the citizens of the El Paso area officially began on Aug. 30, 1901, as El Paso Electric Railway Company.

In the beginning, the emphasis was almost totally on transportation. The coming of the railroads stirred some of the town’s more progressive citizens to action. Seeing the need for more adequate local transportation facilities, a group of men headed by General Anson Mills, who laid out El Paso’s streets and designed the Mills Building, obtained a charter for the El Paso Street Railway Company and the privilege of operating a mule-drawn streetcar system. The system began service in 1882. It expanded, prospered, and routes diversified, but most of the traffic was between El Paso and Juarez.

The mule-car system was doubtlessly considered modern when established. However, as the community grew, it aspired to modern conveniences like any other, and the winds of change were blowing. From the East came reports of electric lighting and streetcars that got their power from overhead electric trolley wires. Some El Pasoans grumbled that mule cars were too slow for an up-and-coming city.

The move to electric cars took place in an elaborate international ceremony in which Mandy the mule was given a ride on a flat car over the new streetcar route between Juarez and El Paso. Mandy pulled one of the last remaining mule-drawn streetcars which was for many years displayed in Cleveland Square in downtown El Paso. Cleveland Square was located on the current site of the El Paso Museum of History and the re-modeled and expanded El Paso Library.

EPE sees 100 years of progress

Electric streetcar routes branched out in all directions from downtown leading to Fort Bliss and Government Hill and to the Mesa Street route.

Also, in the same era, there were other developments in power and light. In 1883, an experiment in the use of batteries as a source of electrical current was unsuccessful commercially, and three years later a small direct generating plant was erected. This was enough to provide current for a few arc street lights and stores.

Then-Mayor Joseph Magoffin and the city council were petitioned by a group of citizens to organize a company under the name of Brush Electric Light Company of El Paso. The first electric light in use in El Paso was said to be Rothschild and Marcuse Jewelers downtown.

By 1890, Zach T. White, prominent El Paso pioneer, had assumed command of the electrical energy business and had new generating equipment installed at Third and Chihuahua Streets. The use of incandescent lamps began in El Paso stores and homes.

The state of Texas issued a charter to the International Light and Power Company in 1889 for the construction and operation of a generating plant to supply power, not only to the city of El Paso and neighboring communities on the northern side of the Rio Grande, but also to Juarez.

1910 railway maintenance

A management contract was negotiated with Stone and Webster Subsidiary Engineers Public Service Company in 1902 that brought El Paso Electric Railway Company its first engineering and financial assistance, an essential part of the utility’s growth.

El Paso Electric Railway Company purchased International Light and Power Company in 1905 and the electric portion of El Paso Gas and Electric Company in 1914. As the electric systems grew, alternating current replaced direct current except for streetcars and some elevators.

Life for the Company’s employees in those days was not without extraordinary excitement. T. Elmer Hearn was quoted in The El Paso Times of August 1951, as having vivid memories of repairing electric facilities in 1910 when bullets showered in El Paso during the Madera revolution in Mexico.

mex revolution battle

"Some of the men stood on top of the Santa Fe plant to watch the excitement, but the bullets began whistling by and they all ducked to safety," Hearn said. "One man was killed as he stood on a porch across from the plant on Santa Fe Street.

"We were called to Juarez to repair lines, and every now and then some ardent revolutionist would start firing his rifle in the air. We made pretty good targets on those poles," he said.

EPE’s growth continued during World War I and the post-war era, and by 1923, generating capacity was up to 18,000 kilowatts while the number of meters had increased to 15,697.

 1922 crew

In 1925, the name El Paso Electric Railway Company was changed to El Paso Electric Company, the same year it became authorized to transact business in the state of New Mexico.

 

rio grande power plant

The Rio Grande Power Plant was built in 1929 in what was then called El Paso’s Upper Valley (now known as Sunland Park, N.M.). High voltage lines from the plant were erected to serve Sierra Blanca and Van Horn, Texas, to the southeast which joined the system in 1927. Hatch and Rincon, N.M., had been added to the system in 1928.

In 1940, El Paso Electric absorbed the Mesilla Valley Electric Company, which had been formed in 1924 in New Mexico to serve Las Cruces and surrounding communities.

El Paso Electric’s relationship with the Stone and Webster Subsidiary Engineers Public Service Company ended in July 1947, and since that time the Company has been an independent electric utility operating in West Texas and Southern New Mexico.

By 1950, EPE had developed kilowatt-hour sales of 347,550,340, but EPE’s growth did not slow at that point. As the community continued to grow and prosper, EPE kept pace in providing additional capacity.

1950 light

That was the year EPE moved quickly ahead with 4,844 new customers connected to the system as growth continued. There were a total of 54,108 customers at the end of the year.

Also in 1950, El Paso Electric purchased the Martin Building, a seven-story office building in downtown El Paso that had been EPE’s operating headquarters since 1924.

In May 1949, EPE placed into operation a new 20,000-kilowatt generating unit at the Rio Grande Power Station, and in March 1950, work was started on a new 30,000-KW unit at the same location, which was placed in operation by March 1951.

An interesting sidelight to the early days in EPE history is reflected in fuel cost figures. The total fuel cost for EPE in 1950 was only $882,257. The cost of fuel and purchased energy in 1996 was $110,720,000.

Throughout EPE’s history, a consistent growth factor has continued at an accelerated rate.

EPE broke ground on Jan. 2, 1956, for the construction of a new turbogenerator of 50,000-kilowatts capacity at the Rio Grande Power Station for commercial operation in 1957. By the end of 1955, there were a total of 75,747 customers in the system.

EPE’s electric power generation was at an all-time high in 1959 -- for the first time exceeding one billion kilowatt-hours.

Newman Power Plant dedication

In 1960, Unit 1 at Newman Power Station had been completed. In the last quarter of that year, preliminary construction was started on Unit 2 with a capability of 90,000 kilowatts for service in 1963. Construction was started in the mid-1960s on still another generating unit at Newman Station, the 115,000-KW Unit No. 3, which went into operation in 1966.

As energy needs increased, EPE purchased a 7 percent undivided interest in two of the five units at Four Corners Generating Station, a coal-fired plant in Farmington, N.M., that was completed in 1969. El Paso Electric receives 104 megawatts from the Four Corners Plant.

The rapid growth of the New Mexico Division of EPE resulted in the construction of a new division office building in Las Cruces in 1967.

men pulling cable

Continually planning for the future needs of a still-growing community, EPE began construction in 1970 on Unit No. 8 at the Rio Grande Station, a 165,000-kilowatt addition for operation in 1972.

EPE has literally come a long way since its humble beginnings in the small border town of El Paso in 1901 and has today grown into a modern technologically advanced organization capable of meeting present and future needs of El Paso, Las Cruces and surrounding areas.

The early ‘70s heralded the beginning of what has been known as the energy crisis and EPE immediately took measures to confront the problem in negotiating long-term fuel contracts, future fuel mix procedures and participation in research and development programs for alternate forms of energy production.

Faced with increasing costs and diminishing supplies of natural gas and oil, industry officials found future electric generation fuels narrowed down to nuclear and coal, and both figure prominently in EPE’s fuel mix.

In 1973, EPE signed an agreement with several other utilities to participate in the Arizona Nuclear Power Project for energy beginning in 1983. The first rate increase in the EPE’s history was granted in December 1974, effective Jan. 1, 1975. A construction permit was granted by the U.S. Nuclear Regulatory Commission in May 1976. Construction on the first unit was started soon thereafter.

Also in 1975, a fourth unit was built at Newman Power Station. This unit is a combined cycle plant, known as "Power at Combined Efficiency" or PACE, and consists of two combustion turbines and a steam turbine. The unit is more efficient because the exhaust heat from the combustion turbines is used to heat water in a boiler which provides steam to drive the turbine.

Expansion and growth have been the rule for EPE over the years from only a few kilowatts of output and a handful of customers in 1901 to net electric energy output at the end of 1996 of 14,285,373 (retail 5,652,907 + wholesale 8,632,466) megawatts to serve about 279,326 customers.

The nuclear plant, known as Palo Verde Nuclear Generating Station, has three units, which were completed and went “online” in February 1986, September 1986, and September 1988, for Units 1, 2 and 3, respectively. EPE has a 15.8 percent interest in the three 1,270-megawatt units. An achievement was reached in 1990 when Palo Verde produced more electricity than any other commercial nuclear plant in the country, and it cost less to build per kilowatt-hour than any other nuclear plant serving Texas.

The last nine decades have brought much change and growth to a company that started out in the transportation business that served both El Paso and Juarez. In a sense, it has returned to serving both sides of the border as EPE signed an agreement with the Republic of Mexico to provide power to Mexico’s rapidly growing northern border area. Mexico has experienced exceptional growth in the demand for electricity, and EPE is strategically located to supply a portion of that demand.

There is no doubt that the last 100 years have brought a new breed of citizen to our community and employee to EPE. However, one thing remains timeless, the employees are dedicated to providing a good place for themselves and their families to live and work. From the inception of El Paso Electric Railway Company through the decades of change, the employees have strived to provide the best customer service possible. Whether driving a team of mules in the early days, maintaining the power plant switchboard, climbing poles to restore electric service, designing a substation, or fulfilling administrative duties, the employees have dedicated themselves to serving the customer.